Article No. | DN | ø D | PN (bar) | L (mm) | L1 (mm) | weight (kg) | Availability | watchlist |
---|---|---|---|---|---|---|---|---|
4526V00900 | 80 | 90 | 10 | 260 | 180 | 3.900 | assembly time | |
4526V01100 | 100 | 110 | 10 | 287 | 204 | 4.600 | assembly time | |
4526V01250 | 100 | 125 | 10 | 302 | 219 | 4.900 | assembly time | |
4526V01400 | 125 | 140 | 10 | 333 | 243 | 6.950 | assembly time | |
4526V01600 | 125 | 160 | 10 | 348 | 258 | 7.150 | assembly time | |
4526V01601 | 150 | 160 | 10 | 345 | 260 | 8.200 | assembly time | |
4526V01800 | 150 | 180 | 10 | 360 | 270 | 8.700 | assembly time | |
4526150200 | 150 | 200 | 10 | 500 | 415 | 9.200 | assembly time | |
4526V02000 | 200 | 200 | 10 | 390 | 290 | 20.900 | assembly time | |
4526V02250 | 200 | 225 | 10 | 405 | 305 | 13.600 | assembly time | |
4526V02500 | 200 | 250 | 10 | 425 | 326 | 14.200 | assembly time | |
4526V02800 | 250 | 280 | 10 | 433 | 317 | 22.400 | assembly time | |
4526250315 | 250 | 315 | 10 | 654 | 538 | 31.500 | assembly time | |
4526V03150 | 300 | 315 | 10 | 469 | 347 | 31.450 | assembly time | |
4526V03550 | 300 | 355 | 10 | 469 | 347 | 33.350 | assembly time |
DN
watchlist
4526V00900 | 80 | |
ø D | 90 | |
PN | 10 bar | |
L | 260 mm | |
L1 | 180 mm | |
weight | 3.900 kg | |
Availability | assembly time | |
4526V01100 | 100 | |
ø D | 110 | |
PN | 10 bar | |
L | 287 mm | |
L1 | 204 mm | |
weight | 4.600 kg | |
Availability | assembly time | |
4526V01250 | 100 | |
ø D | 125 | |
PN | 10 bar | |
L | 302 mm | |
L1 | 219 mm | |
weight | 4.900 kg | |
Availability | assembly time | |
4526V01400 | 125 | |
ø D | 140 | |
PN | 10 bar | |
L | 333 mm | |
L1 | 243 mm | |
weight | 6.950 kg | |
Availability | assembly time | |
4526V01600 | 125 | |
ø D | 160 | |
PN | 10 bar | |
L | 348 mm | |
L1 | 258 mm | |
weight | 7.150 kg | |
Availability | assembly time | |
4526V01601 | 150 | |
ø D | 160 | |
PN | 10 bar | |
L | 345 mm | |
L1 | 260 mm | |
weight | 8.200 kg | |
Availability | assembly time | |
4526V01800 | 150 | |
ø D | 180 | |
PN | 10 bar | |
L | 360 mm | |
L1 | 270 mm | |
weight | 8.700 kg | |
Availability | assembly time | |
4526150200 | 150 | |
ø D | 200 | |
PN | 10 bar | |
L | 500 mm | |
L1 | 415 mm | |
weight | 9.200 kg | |
Availability | assembly time | |
4526V02000 | 200 | |
ø D | 200 | |
PN | 10 bar | |
L | 390 mm | |
L1 | 290 mm | |
weight | 20.900 kg | |
Availability | assembly time | |
4526V02250 | 200 | |
ø D | 225 | |
PN | 10 bar | |
L | 405 mm | |
L1 | 305 mm | |
weight | 13.600 kg | |
Availability | assembly time | |
4526V02500 | 200 | |
ø D | 250 | |
PN | 10 bar | |
L | 425 mm | |
L1 | 326 mm | |
weight | 14.200 kg | |
Availability | assembly time | |
4526V02800 | 250 | |
ø D | 280 | |
PN | 10 bar | |
L | 433 mm | |
L1 | 317 mm | |
weight | 22.400 kg | |
Availability | assembly time | |
4526250315 | 250 | |
ø D | 315 | |
PN | 10 bar | |
L | 654 mm | |
L1 | 538 mm | |
weight | 31.500 kg | |
Availability | assembly time | |
4526V03150 | 300 | |
ø D | 315 | |
PN | 10 bar | |
L | 469 mm | |
L1 | 347 mm | |
weight | 31.450 kg | |
Availability | assembly time | |
4526V03550 | 300 | |
ø D | 355 | |
PN | 10 bar | |
L | 469 mm | |
L1 | 347 mm | |
weight | 33.350 kg | |
Availability | assembly time | |
Characteristics
- Pressure PN 16
Installation and assembly
- Insert the PE weld-on end in the BAIO® sleeve and secured against shearing with the locking ring. Tighten the socket screw.
Material
- Bored to SDR 17
- Einschweissstutzen
- Standard: PE 100, SDR 11 - Stützhülse
- INOX - Verriegelungsring
- Sphäroguss EN-GJS-400 (GGG 40)
- EWS-Beschichtung nach GSK, RAL-GZ 662, Schichtdicke min. 250 μm
Caution
- Incl. locking ring ring
- The PE nozzles on the spigot-end are turned approx. 120 mm down on the SDR 17 for the mirror welding process.
more